Case Studies

Genzyme Biotech Research Laboratory
Two Air Enterprises’ AHUs and four Energy Recovery Wheels installed in Genzyme Biotech Research Laboratory, Boston
CHALLENGE: Genzyme’s eight-story bio-chemical research laboratory was operating with outdated air handling equipment. Mechanical rooms on eight hospital floors needed air handling unit upgrades. There was an urgent need to improve ventilation, meet current codes and save on air handling costs for research labs.
Read More
Sanford Burnham

CHALLENGE: Sanford Burnham had significant design considerations when selecting an air handling system for its research lab space. The lab had very little access for the equipment to be installed, and the air handling unit had to fit in with the existing boiler room.
Read More